To undertake the boiler and hot water generation plant and controls system replacement to improve system resilience within the live private hospital in Reading.
St Georges Hospital
Refurbishment of 4 U.C.V Operating Theatres at St Georges’ Hospital in Tooting, South London. EDP Environmental are preparing the Design and Build tender documentation for the first 2 phases of works, and undertaking the feasibility studies for a further 2 stages.
Harley Street Operating Theatre
The provision of two new operating theatres and associate recovery and support spaces within the existing building at 19 Harley Street.
EDP Environmental have a wealth of experience within the Healthcare sector. Projects include highly serviced Sterile Services (Decontamination suites), Imaging suites, and operating theatres. Designing for both new and refurbishment projects, EDP Environmental are conversant with designing for phased installations, working in live patient areas, and working with the Health Technical Memoranda (HTMs) and Health Build Notes (HBNs) design guidance documents.
RD&E Hospital – Out Patients Department
To undertake the full M & E Design and Cost Management of the facility in a live environment. The project was completed over six phases as the department had to be kept running throughout the refurbishment.
Recent Health Projects
Barnet Hospital SSD Washer
Okehampton Medical Centre
Whittington Hospital Maternity Unit
Leonard Cheshire Hydrotherapy Pool
The Beech Torbay
Recent Health Projects
Optimax Cardiff
Nuffield Health National
Whittington Hospital Section 136 Rooms
Four Seasons Health
Langdon Hospital Substation