Solutions for a Sustainable Future
Construction Work
Energy Design
Lighting Design
Health Sector Work
EDP Working together
3 River Court, Pynes Hill, Exeter, EX2 5JL, Tel: 01392 367237, Fax: 01392 367240

EDP have relocated

EDP Designing Practice
undefined

Wind Turbines

Wind Turbines generate electricty via a battery bank. They should be sited in areas with a good average wind speed and away from obstructions such as buildings, bridges and trees.