BARNET HOSPITAL
To prepare a feasibility report, for the proposed replacement of the Washer Disinfectors within the existing Sterile Services Department, at Barnet Hospital.
Our Role
Working with the Hospital Engineering Department, and the Sterile Services Department Manager, EDP Environmental undertook a system resilience review and prepared a feasibility report for the replacement of the existing Washer Disinfectors within this live hospital environment
Providing a critical service within the hospital for the washing and disinfection of the clinical instruments, these Washer Disinfectors are reliant upon a number of services including:
- Steam and Condense Supply
- Hot (Process) Water Supply
- High Temperature Water Discharge To Drain
- Reverse Osmosis (RO) Hot Water Supply
The feasibility report considered the existing main plant resilience and continuation of supply, and the phased plant replacement within this live critical department.
The Team
- Client
Royal Free London NHS Trust - Architect
CFES Ltd - Main Contractor
CFES Ltd - Services Contractor
CFES Ltd - Project Value
£ 250K (Estimated Contract Value)