project

EAGLE YARD

Construction of 3 blocks with 28 high end student apartments.  Each apartment included their own kitchen, living space, bedroom and en-suite.

Our Role

EDP Environmental worked along side the Architect and carried out the full Mechanical and Electrical design on the building, and Part L compliance.

The Team
  • Client
    Tybourne Limited
  • Architect
    Highway Field Associates
  • Main Contractor
    Tybourne Limited
  • Services Contractor
    Priddy Engineering Limited
  • Project Value
    £ 2.3M
Systems Included
  • Utility Supplies
  • Lighting
  • Fire Alarm System
  • Access Control System
  • Heating
  • Domestic Services
  • Ventilation
  • Controls