project

EXETER CITY FOOTBALL CLUB

The works at Exeter City Football Club’s, St James Park included the construction of new changing rooms, refreshment facilities, toilet blocks and a 1600 seat grandstand with spectator facilities. Works also comprised of renovation of the away end by removing the existing terracing and replacing with a semi-permanent stand, providing cover for 1000 spectators.

Our Role

EDP Environmental undertook the Full Design and Consultancy Duties from RIBA Stage 3 through to RIBA Stage 5 for the proposed development. One of our challenges was to integrate the new MEP services into the existing systems enabling the club to remain fully functional throughout this period.

The Team
  • Client
    Exeter City Football Club
  • Architect
    KTA
  • Main Contractor
    GL Events
  • Services Contractor
    MAT Electrics/Brothwell Irvine
  • Project Value
    £ 3.5M
Systems Included
  • Heating Design Including Main Plant/Radiator Selection
  • Domestic Water Design Including Mains Distribution
  • Ventilation Design to Comply with Building Regulations
  • Above Ground Drainage
  • BMS Controls
  • Electrical Distribution Including Mains Supplies and Small Power
  • Internal and External Lighting
  • Full Fire, Security and Data
  • Part L Compliance including SBEM