Graveney School
The development of a Stage 3 MEP Service Design for letting as a Design and Build Contract, for this new 3 storey timber structure building, accommodating 12 classrooms and a roof mounted observatory.
Our Role
EDP Environmental carried out the Stage 2/3 Mechanical and Electrical Design.
The Team
- Client
Graveney School - Architect
Urban Projects Bureau - Main Contractor
Quinn London - Services Contractor
Quinn London - Project Value
£ 1M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- Air Source Heat Pump Heating System, Including Generation and Distribution
- Domestic Hot and Cold Water Services
- Lighting
- Small Power
- Fire Detection and Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services, including Gas, Water and Electrical Supplies