project

Graveney School

The development of a Stage 3 MEP Service Design for letting as a Design and Build Contract, for this new 3 storey timber structure building, accommodating 12 classrooms and a roof mounted observatory.

Our Role

EDP Environmental carried out the Stage 2/3 Mechanical and Electrical Design.

The Team
  • Client
    Graveney School
  • Architect
    Urban Projects Bureau
  • Main Contractor
    Quinn London
  • Services Contractor
    Quinn London
  • Project Value
    £ 1M
Systems Included
  • Mechanical (Heat Recovery) Ventilation Systems
  • Air Source Heat Pump Heating System, Including Generation and Distribution
  • Domestic Hot and Cold Water Services
  • Lighting
  • Small Power
  • Fire Detection and Alarm
  • Security System
  • Above Ground (Foul) Drainage
  • Building Services Controls Systems
  • Incoming Services, including Gas, Water and Electrical Supplies