project

LONDON SCHOOL FOR BOYS

The remodelling of an area within the school to provide a state of the art learning resource facility.

Our Role

EDP Environmental worked with the design team to develop the client brief and prepare the detailed design for the refurbishment of key areas of the school, including the Reception, Library and several teaching spaces to provide an enhanced learning environment. EDP worked closely with the Mechanical and Electrical contractor during the installation period to adapt the design to suit unforeseen restrictions once access was available for detailed surveys, and to assist completion within a tight timescale during the school summer holidays.

The Team
  • Client
    London School For Boys
  • Architect
    Rock Townsend
  • Main Contractor
    Kier Facilities Services Ltd
  • Services Contractor
    William Coates
  • Project Value
    £ 900K
Systems Included
  • Split System Air Conditioning
  • Ventilation
  • Electrical Distribution
  • Small Power
  • Lighting with Occupancy and Daylight Controls
  • Access Control and Communications