project

Lymington Fields School

Lymington Fields is a new 10,000 square metre combined Primary and Secondary School on an urban regeneration development site.

The development is a new “L” shaped building, comprising of a 2-storey Primary School and a 3-storey Secondary School with shared kitchen and assembly / dining hall facilities, as well as a new sports hall.

Our Role

Mechanical and Electrical Services design and associated consultancy services relating to the proposed new teaching facilities.

The Team
  • Client
    MID Group
  • Architect
    Bond Bryan Architects
  • Main Contractor
    MID Group
  • Services Contractor
    Greenside Integrated Services
  • Project Value
    £ 30M
Systems Included
  • Mechanical (Heat Recovery) Ventilation Systems
  • Air Source Heat Pump Heating and Cooling System
  • Domestic Hot and Cold Water Services
  • Lighting
  • Small Power
  • Fire Detection and Alarm
  • Security System
  • Above Ground (Foul) Drainage
  • Building Services Controls Systems
  • Incoming Services, including Gas, Water and Electrical Supplies
  • Combined Heat and Power System
  • Photovoltaics