Mayfield Leisure Centre
A new Community Leisure Facility for Redbridge Council, including a public 26m, 6 lane swimming pool with spectator seating and changing village. It also comprised of a 40 station state of the art gymnasium.
Our Role
EDP Environmental undertook the full MEP design and consultancy duties.
The Team
- Client
Redbridge Council - Architect
Etec Group - Main Contractor
Etec Group - Services Contractor
Etec Group - Project Value
£ 5.3M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- Domestic Hot and Cold Water Services
- Combined Heat and Power (CHP) Unit
- Lighting
- Small Power
- Fire Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services Including Gas, Water and Electrical Supplies