Archives: Projects
Custom post type for projects
PLYMOUTH ARGYLE FOOTBALL CLUB
This project consisted of the redevelopment and renovation of the existing Mayflower Stand of Plymouth Argyle’s Home Park.
The renovation and extension works to the existing stand includes a 600 seat conference facility, new corporate boxes and pitch-side seating, and improvements to the existing bars. The extension on the first floor comprises of club offices/administration spaces.
The redevelopment also includes new club shop/ticket office and newly constructed players and officials changing facilities.
Our Role
EDP Environmental undertook the Full Design and Consultancy Duties from RIBA Stage 3 through to RIBA Stage 5.
The Team
- Client
Plymouth Argyle Football Club - Architect
KTA - Main Contractor
GL Events - Services Contractor
Brothwell Irvine/CTI Power - Project Value
£ 6M
Systems Included
- Heating Including Main Plant/Radiator Selection
- Domestic Water Including Mains Distribution
- Ventilation to Comply with Building Regulations
- Above Ground Drainage
- BMS Controls
- Electrical Distribution Including Mains Supplies and Small Power
- Internal and External Lighting
- Full Fire, Security and Data
- Part L Compliance including SBEM
Onslow House, Guildford
Refurbishment of an existing office facility back to a CAT A fit-out, following the existing tenant vacating the space.
Our Role
EDP Environmental undertook the full MEP services detailed design.
The Team
- Client
William Coates - Architect
AWW - Main Contractor
Graham Construction - Services Contractor
William Coates - Project Value
£ 2M
Systems Included
- Ventilation
- Air Conditioning
- Drainage
- Domestic Water
- Lighting
- Ancillary Electrical Services
- Small Power
STONEHOUSE
Stonehouse is an affordable and social housing development of 56 units in Plymouth built on a “brown field” site.
Our Role
EDP Environmental worked alongside the architect in creating a development that was functional but also had an aesthetic appeal. We worked in line with the client’s standard specification to design the heating systems, domestic services, ventilation, power, lighting, door entry, security and fire alarms.
We also arranged the provision of utilities to the site via the local district network operators.
The Team
- Client
Guinness Trust - Architect
Michell Architects - Main Contractor
Balfour Beatty - Services Contractor
T Clarke - Project Value:
£ 7.7M
Systems Included
- Electrical Distribution
- Lighting & Power
- UPS Systems
- Ventilation
- Heating & Water Services
- Medical Gases
- Access Control & Communications
HOLSWORTHY CATTLE MARKET
Construction of a new modern cattle market with associated small shopping outlets, offices and car park.
Our Role
EDP Environmental carried out the full MEP designs and site supervision for the facility fit out.
The Team
- Client
Kivals - Architect
Trewin Architects - Main Contractor
Pearce Construction - Services Contractor
Bowdens - Project Value
£ 8M
Systems Included
- Local Heating
- Washdown Facilities
- Domestic Hot & Cold Water
- Lighting
- Power
- Specialist Earthing
- Fire
- Data/IT Systems
TEMPLAR HOUSE
The Client, Careflex Ltd, had outgrown the existing premises and had secured a new factory unit. This required M & E fit out working closely with the Client to identify energy saving measures.
Our Role
EDP carried out the full M & E design and site supervision for the fit out of the factory.
The Team
- Client
Careflex Ltd - Architect
Kirkham Board - Main Contractor
Midas - Services Contractor
Dodds - Project Value
£ 350K
Systems Included
- Radiant Panel Heating
- Domestic Hot & Cold Water
- Daylight Linked Lighting
- Small Power
- Fire
- Data/IT Systems
- Security Systems
STAGECOACH EXETER
New purpose built Depot and Maintenance Facility for Stagecoach Buses. The development is on a 3 acre site on an industrial estate in Exeter. Some of the site involved reclaiming part of the Park & Ride Facility car park. The building is a facility that handles the night storage, maintenance and refuelling of Stagecoach's fleet of 160 buses.
Our Role
EDP Environmental worked with the main contractor, Andrew Cowie Construction, to deliver the project to Stagecoach specifications. We carried-out the detailed MEP Design and were involved in site coordination.
The Team
- Client
Stagecoach - Architect
Andrew Cowie Construction - Main Contractor
Andrew Cowie Construction - Services Contractor
Totus Engineering - Project Value
£ 8.5M
Systems Included
- Heating and Hot & Cold Water Services
- Radiant Task Heating
- Ventilation
- High Bay Lighting
- Office Lighting
- Small Power
- Wash Bays
- Paint Booth
- Services for Pneumatic and Hydraulic Service Equipment
DUCHY NURSERY
The Duchy of Cornwall created a new customer shop and café building within their Nursery in Lostwithiel Cornwall. The heating and hot & cold water were provided by a wood pellet biomass boiler.
Our Role
EDP Environmental carried out the full MEP designs for the project. We also managed the site installations including the witnessing of commissioning of all the MEP systems.
The Team
- Client
Duchy of Cornwall - Architect
Duchy of Cornwall - Main Contractor
EBC - Services Contractor
Dodds - Project Value
£ 1.5M
Systems Included
- Biomass Boiler
- Underfloor Heating
- Domestic Hot & Cold Water
- Lighting
- Small Power
- Fire
- Data/IT Systems
- Security Systems
MOLE AVON TRADING
New purpose built retail and bulk goods facility for the Mole Valley Farmers Group. This is part of a regional chain of 55 similar outlets selling vegetables, dry goods, fresh prepared chilled food, butchery items, hardware and country store items from the shop. The warehouse part stocks and sells a wide range of bulk goods and larger items from animal feedstuff to fencing and farming hardware.
Our Role
EDP Environmental produced the detailed MEP Design. This included different building services systems in the shop, the warehouse and the offices.
The Team
- Client
Mole Avon - Architect
Alder King - Main Contractor
Devon Contractors - Services Contractor
Into Heat - Project Value
£ 1.8M
Systems Included
- High Bay Lighting
- LED Low Energy Lighting
- Small Power
- Heating and Hot & Cold Water Systems
- Ventilation
- Split System Air Conditioning
- Access Control System
- Fire Alarm System
- Communications & Data
- Photo-voltaic Panels
BARNCOOSE
Barncoose is a mixed use property development in Redruth, Cornwall which is part of a European Development Fund initiative. The project consists of four separate buildings. It was a requirement that each of the buildings be designed to and achieve a BREEAM Rating of Excellent.
Our Role
We worked very closely with the BREEAM Assessor and the Project Team to identify “realistic to achieve” Credits. EDP then carried-out the detailed MEP Design of each building in accordance with the project objectives.
EDP provided the post-construction BREEAM appraisal to the assessor and assisted with the final BREEAM Assessment. All four buildings duly achieved a rating of BREEAM Excellent.
The Team
- Client
Frame UK - Architect
Frame UK - Main Contractor
Frame UK - Services Contractor
Dodd Group - Project Value
£ 16M
Systems Included
- Heating and Hot & Cold Water Services
- Split System Air Conditioning
- Ventilation
- Electrical Distribution
- Small Power
- Lighting with Occupancy and Daylight Controls
- Access Control and Communications
LONDON SCHOOL FOR BOYS
The remodelling of an area within the school to provide a state of the art learning resource facility.
Our Role
EDP Environmental worked with the design team to develop the client brief and prepare the detailed design for the refurbishment of key areas of the school, including the Reception, Library and several teaching spaces to provide an enhanced learning environment. EDP worked closely with the Mechanical and Electrical contractor during the installation period to adapt the design to suit unforeseen restrictions once access was available for detailed surveys, and to assist completion within a tight timescale during the school summer holidays.
The Team
- Client
London School For Boys - Architect
Rock Townsend - Main Contractor
Kier Facilities Services Ltd - Services Contractor
William Coates - Project Value
£ 900K
Systems Included
- Split System Air Conditioning
- Ventilation
- Electrical Distribution
- Small Power
- Lighting with Occupancy and Daylight Controls
- Access Control and Communications