Robert Clack Lower School
The project consisted of the construction of a new Year 7 teaching block, incorporating 12 general classrooms, and a Food Technology classroom. The project also involved the extensive refurbishment of the lower school kitchen, and the creation of a new beauty teaching facility.
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Robert-Clark-Lower-School-Dagenham-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Robert-Clark-Lower-School-Dagenham-IT-Suite-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Robert-Clark-Lower-School-Dagenham-Kitchen-scaled.jpg)
Our Role
EDP Environmental undertook the full Mechanical and Electrical Design Services.
The Team
- Client
Greenside Integrated Services - Architect
Bond Bryan Architects - Main Contractor
MID Group - Services Contractor
Greenside Integrated Services - Project Value
£ 3M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- Air Source Heat Pump Heating System, including Generation and Distribution
- Domestic Hot and Cold Water Services
- Lighting
- Small Power
- Fire Detection and Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services, including Gas, Water and Electrical Supplies
- Photovoltaics
![](https://www.edp-environmental.co.uk/wp-content/themes/edp/images/cross.png)