ROBERT CLACK UPPER SCHOOL
The project consists of the construction and refurbishment of the upper school.
![](https://www.edp-environmental.co.uk/wp-content/uploads/2020/02/Square-4-5-scaled-e1581508861102.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2020/02/Square-9-scaled-e1581508962831.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2020/02/Square-11-scaled-e1581509067320.jpg)
Our Role
Mechanical and Electrical services design and associated consultancy services relating to the proposed new education accommodation including new 2 story classroom block, extension to, and refurbishment of, the main hall and new entrance.
The Team
- Client
Greenside Integrated Services - Architect
Bond Bryan Architects - Main Contractor
MID Group - Services Contractor
Greenside Integrated Services - Project Value
£ 7M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- Radiator Heating System, Including Generation and Distribution
- Domestic Hot and Cold Water Services
- Lighting
- Small Power
- Fire Detection and Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services, Including Gas, Water and Electrical Supplies
![](https://www.edp-environmental.co.uk/wp-content/themes/edp/images/cross.png)