SPIRE HOSPITAL – DUNEDIN
EDP Environmental were appointed by St Georges NHS Trust to prepare the RIBA Stage 4 design for the refurbishment of 4 number operating theatres within the hospital. The contractor was let as a Design and Build contract, and EDP Environmental were appointed as Contract Administrators and technical advisors on behalf of the Trust.
Our Role
The works were undertaken in a live environment, with surgical operations being undertaken in adjoining rooms, meaning noise and dust had to be kept to a minimum.
The Team
- Client
Spire Health Care - Architect
CFES Limited - Main Contractor
CFES Limited - Services Contractor
CFES Limited - Project Value
£ 3.5M
Systems Included
- Electrical Distribution
- Lighting & Power
- UPS Systems
- Ventilation
- Heating & Water Services
- Medical Gases
- Access Control & Communications