SPIRE HOSPITAL – DUNEDIN

EDP Environmental were appointed by St Georges NHS Trust to prepare the RIBA Stage 4 design for the refurbishment of 4 number operating theatres within the hospital. The contractor was let as a Design and Build contract, and EDP Environmental were appointed as Contract Administrators and technical advisors on behalf of the Trust.

Our Role

The works were undertaken in a live environment, with surgical operations being undertaken in adjoining rooms, meaning noise and dust had to be kept to a minimum.

The Team
  • Client
    Spire Health Care
  • Architect
    CFES Limited
  • Main Contractor
    CFES Limited
  • Services Contractor
    CFES Limited
  • Project Value
    £ 3.5M
Systems Included
  • Electrical Distribution
  • Lighting & Power
  • UPS Systems
  • Ventilation
  • Heating & Water Services
  • Medical Gases
  • Access Control & Communications