project

ST DAVID’S BUILDING

Renovating and remodelling the existing St David’s Building at West of England School to improve the residential accommodation. The school relied on fundraising to enable this project to go ahead so tight budget control was required at all stages of design and construction.

Our Role

EDP Environmental carried out the fully detailed MEP Design to improve the heating, domestic and ventilation systems to the requirements of the National Care Standards. Systems were carefully designed to ensure maximum usability to the learners with visual impairments while ensuring suitability for a site wide expansion project in the future.

The Team
  • Client
    West of England School
  • Architect
    Lee Wright Associates
  • Main Contractor
    Midas
  • Services Contractor
    Totus
  • Project Value
    £ 1.2M
Systems Included
  • Heating and Hot & Cold Water Services
  • Ventilation
  • Electrical Distribution
  • Small Power
  • Lighting - Uniform with Glare Control and Minimal Contrast
  • Nurse Call System
  • Access Control and Communications