project

Stonebridge School

New single-story teaching block, hall and number of refurbishments within the existing school.

Our Role

EDP Environmental undertook the Stage 4 and 5 design duties on behalf of the MEP services contractor.

The Team
  • Client
    Greenside Integrated Services
  • Architect
    McBains Cooper
  • Main Contractor
    MID Group
  • Services Contractor
    Greenside Integrated Services
  • Project Value
    £ 2.5M
Systems Included
  • Mechanical (Heat Recovery) Ventilation Systems
  • Heating and A/C Systems, including Generation and Distribution
  • Domestic Hot and Cold Water Services
  • Lighting
  • Small Power
  • Fire Detection and Alarm
  • Security Systems
  • Above Ground (Foul) Drainage
  • Building Services Controls Systems
  • Incoming Services, including Gas, Water and Electrical Supplies
  • Photovoltaics