Stonebridge School
New single-story teaching block, hall and number of refurbishments within the existing school.
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Stonebridge-School-London-Classroom-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Stonebridge-School-London-Toilets-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Stonebridge-School-London-Hall-scaled.jpg)
Our Role
EDP Environmental undertook the Stage 4 and 5 design duties on behalf of the MEP services contractor.
The Team
- Client
Greenside Integrated Services - Architect
McBains Cooper - Main Contractor
MID Group - Services Contractor
Greenside Integrated Services - Project Value
£ 2.5M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- Heating and A/C Systems, including Generation and Distribution
- Domestic Hot and Cold Water Services
- Lighting
- Small Power
- Fire Detection and Alarm
- Security Systems
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services, including Gas, Water and Electrical Supplies
- Photovoltaics
![](https://www.edp-environmental.co.uk/wp-content/themes/edp/images/cross.png)