Sugar House Island Primary School
A new primary school comprising of a 3-storey concrete frame building with usable roof space that will provide facilities for over 400 pupils in the area. This is part of a larger urban redevelopment programme within Stratford, East London.
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Sugar-House-Island-Primary-School-Stratford-Perspective-South-East-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Sugar-House-Island-Primary-School-Stratford-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/Sugar-House-Island-Primary-School-Stratford-Exterior-scaled.jpg)
Our Role
EDP Environmental are undertaking the Mechanical and Electrical Services Design and Associated Consultancy Services.
The Team
- Client
MID Group - Architect
Penoyre & Prasad - Main Contractor
MID Group - Services Contractor
Greenside Integrated Services - Project Value
£ 15M
Systems Included
- Mechanical Ventilation Systems
- Heating System, Including Generation and Distribution
- Domestic Hot and Cold Water Services, Including Generation and Distribution
- Lighting
- Small Power
- Fire Detection and Alarm
- Security Systems
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services
![](https://www.edp-environmental.co.uk/wp-content/themes/edp/images/cross.png)