The Range
Construction of a new 5 storey office, store and associated infrastructure, relating to the proposed Head Office and Super Store for The Range, Plymouth Devon.
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/The-Range-HQ-Plymouth-Front-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/The-Range-HQ-Plymouth-Car-Park-scaled.jpg)
![](https://www.edp-environmental.co.uk/wp-content/uploads/2021/11/The-Range-HQ-Plymouth-Aerial-View-scaled.jpg)
Our Role
EDP Environmental provided Full Mechanical and Electrical design services for the office building.
The Team
- Client
The Range (Derriford) - Architect
Bailey Architects - Services Contractor
Totus Engineering - Project Value
£ 10M
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- VRF Air Conditioning
- Water Services (Boosted)
- Lighting
- Small Power
- Fire Detection and Alarm
- Security System
- External Lighting
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Water and Electrical Supplies
- PV to Satisfy CS20
![](https://www.edp-environmental.co.uk/wp-content/themes/edp/images/cross.png)