YOUNG STREET

A mixed residential building in the heart of Kensington including 15 social housing properties, 1, 2, 3 and 4 bedroom private dwellings, and 4 large high end penthouse suites. The building also incorporated a resident’s gymnasium, cinema, and reception/concierge area.

Our Role

EDP Environmental worked with the mechanical and electrical contractor developing the working drawings, in particular the central plant room setting out and 3D modelling.

The MEP services incorporated central heating and cooling plant, with heat interface units to each apartment for hot water generation and heating distribution via underfloor heating. A central cooling plant provided mechanical cooling to each apartment. Local ventilation systems provided “whole house” heat recovery ventilation to each apartment.

The Team
  • Client
    Grainger
  • Architect
    Assael Architecture Limited
  • Main Contractor
    Elmer Construction
  • Services Contractor
    Greenside Integrated Services
  • Project Value
    £ 40M
Systems Included
  • Central Heating Boilers and CHP Units
  • Ventilation
  • Chilled Water Cooling System
  • Lighting, Fire and security Systems