St Clare Medical Centre
St Clare Medical Centre is a combined doctor's surgery with small procedures operating theatre in Penzance, Cornwall. The project consists of two floors providing waiting areas, consulting rooms, treatment rooms and admin support. It was a requirement that the building was designed to and achieve BREEAM Rating of Very Good.
Our Role
We worked very closely with the BREEAM Assessor and the Project Team to identify “realistic to achieve” Credits. EDP then carried-out the detailed MEP Design of the building in accordance with the project objectives.
The Team
- Client
St Clare Medical Centre - Architect
PBWC - Main Contractor
Brady Construction - Services Contractor
Totus - Project Value
£ 6M
Systems Included
- Heating and Hot & Cold Water Services
- Air Conditioning
- Natural Ventilation
- Electrical Distribution
- Small Power
- Lighting with Occupancy and Daylight Controls
- Access Control
- Communications
- Fire and Security
- P.V. Array
Nar Ouse
The 15 hectare Nar Ouse Regeneration Area includes a total of 57no. high quality light industrial, manufacturing and office premises. To realise the sites maximum potential, existing HP gas, HV O/H lines, rising main and BT poles were diverted/removed.
Our Role
To assist with the coordination of the HP Gas diversion and HV O/H line undergrounding and the detailed design of speculative units and D&B performance design of the pre-let units.
The Team
- Client
BCKLWN - Architect
AHR - Main Contractor
Various - Services Cotractor
TBC - Project Value
£ 30M
Systems Included
- ASHP
- Natural Ventilation
- PV Panels
- External Lighting
- EV Charging Stations
Kitchener Barracks
The conversion of existing military accommodation into a luxury high-end housing development in Chatham. The project consists of 3 blocks of four stories each with 7 units on each story giving a total of 84 units which will be built ’off site’ as well as the remodelling of a four-story building into a 64 unit residential block.
Our Role
To undertake the Mechanical and Electrical Services design and a.ssociated consultancy services relating to the proposed new residential development
The Team
- Client
TopHat - Architect
Bond Bryan Architects - Main Contractor
TopHat - Services Contractor
Greenside Integrated Services
Systems Included
- Mechanical Ventilation Systems
- Heating System, including Generation and Distribution
- Domestic Hot and Cold-Water Services
- Lighting
- Small Power
- Fire Detection and Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Sprinkler System
- Incoming Services, including Water, IT, and Electrical Supplies
Westlands Cricket Pavilions
The demolition of the existing pavilions at Westlands Sports and Social Club in Yeovil, to be replaced with a brand new single storey building. This development will modernise the facilities that are used by many local community groups including cricket and bowls teams and provide a fresh socialising space for the local area.
Our Role
The full M&E design and associated consultancy services, including Part L compliance checks.
The Team
- Client
South Somerset District Council - Architect
Kirkham Board - Main Contractor
EBC - Services Contractor
Watertite/REF Electrics Taunton
Systems Included
- Electrical Systems
- Lighting
- Fire Alarm
- Communications
- Security Including CCTV, Intruder, Access Control
- Water Services
- Heating
- Ventilation
- Controls
Rowancroft
A £7.7 million project constructing 7 modern student accommodation blocks in Exeter to provide 188 study rooms, 31 studio apartments and 14 fully accessible units.
Our Role
EDP Environmental carried out the design of ventilation, power, lighting, sub-distribution frameworks, commercial & domestic gas, full plumbing and heating systems, specialist ELV systems, data infrastructure, security and fire alarms.
The Team
- Client
University of Exeter - Architect
Archial Architects - Main Contractor
Mi-Space - Services Contractor
Vince Building Services - Project Value
£ 7.7M
Systems Included
- Centralised Plant Room
- Solar Thermal Hot Water
- Photovoltaic Panels PV
- Supply & Extract Ventilation
- Fire Alarm System
- Access Control System
- CCTV
- IT Infrastructure
- Cable TV
Rochester Riverside School
This is a newly designed single form entry S106 primary school that is part of a major housing regeneration project on the waterfront in Rochester. It has been designed to be a 2FE school as it grows to accommodate 420 pupils. The building sits on a raised deck to keep the accommodation out of the flood plain and provide external teaching space for the nursery and reception classes. The lower deck acts as a car park for staff and plantroom space for the incoming services and domestic water systems all protected within a tanked plantroom envelope. As well as ground floor accommodation (4 classrooms, entrance lobby, kitchen and hall), and first floor accommodation (5 classrooms, learning resource and staff room).
Our Role
EDP Environmental are excited to be working for Mid Group and their design team on our fourth project with them. EDP are providing the MEP design to Stage 4 at present as the school needs an Academy Trust to operate it. The design is around a concrete frame building with Innovare CLT panels for the external and internal walls and roof. The design embodies MMC principals and techniques. Breathable Building NVHR units have been provided to classrooms and internal comfort conditions maintained all year round by a VRF system providing heating and domestic hot water. The building is due for completion in June 2021.
The Team
- Client
MID Group - Architect
Bond Bryan - Main Contractor
MID Group - Services Contract
Greenside Integrated Services - Project Value
£ 8M - Photo Credit
MID Group and Perspective Media
Systems Included
- Mechanical (Heat Recovery) Ventilation Systems
- LPHW (Underfloor) Heating System, Including Generation and Distribution
- VRF and DX Heating and Cooling Systems
- Domestic Hot and Cold Water Services
- Lighting
- Small Power, Including Standby UPS Systems
- Fire Detection and Alarm
- Security System
- Above Ground (Foul) Drainage
- Building Services Controls Systems
- Incoming Services, Including Gas, Water and Electrical Supplies
- New 400KVA Incomer and Power Distribution
- EV Charging Points to Car Parking
Broxbourne School
This is an 8FE secondary school which is under construction in the heart of Hertfordshire, a new state of the art education facility for the local community. It has been designed around a central spine with three fingers for science, art, and design technology. The central spine houses a new indoor sports hall, a large atrium for dining and a music school. Externally there are exemplary sports facilities including two MUGA’s, a synthetic turf pitch, and floodlit hard courts, all for school and community use.
Our Role
EDP Environmental are excited to be working for MID Group and their design team. EDP are providing the full MEP design of this co-ed school complete with Sixth Form facilities as part of a new residential development near Broxbourne. The design is around a concrete frame building with CLT panels for the external and internal wall and embodying the principals of modern methods of construction. Breathable Building NVHR units have been provided to classrooms and internal comfort conditions maintained all year round by a VRF system. The building is due for completion in June 2021.
The Team
- Client
MID Group - Architect
Bond Bryan Architects - Main Contractor
MID Group - Services Contractor
Greenside Integrated Services - Project Value
£ 28M
Systems Included
- VRF Air Conditioning
- LTHW Underfloor Heating and Radiant Panel Heating
- NVHR and MVHR Ventilation Systems for Internal Zones and Kitchen
- Centralised Gas Fired Domestic Hot Water
- New 800KVA Transformer and Power Distribution
- LED Lighting Throughout
- Single Lift
- EV Charging Points
EXMOUTH HOSPITAL
This project saw the complete refurbishment of the Hospital Kitchen for Exmouth Hospital. The existing kitchen did not comply with current standards, it was therefore completely gutted and received complete new plumbing, electrics, and fixtures & fittings. A modern high efficiency Kitchen Ventilation system was installed which improved working conditions and removed cooking odours.
Our Role
EDP carried out the full MEP Design and Specification for the new kitchen and supervised the implementation of the project. Because of the increased electrical load we also needed to assess the existing distribution system and design a suitable upgrade.
The Team
- Client
Devon Partnership Trust - Architect
Hart Ireson - Main Contractor
Dodd Group - Services Contractor
Dodd Group - Project Value
£ 300K
Systems Included
- Electrical Distribution
- Gas Supply
- Water Supplies
- Heating System
- Lighting
- Power
- Telephones
- Fire Alarm
YOUNG STREET
A mixed residential building in the heart of Kensington including 15 social housing properties, 1, 2, 3 and 4 bedroom private dwellings, and 4 large high end penthouse suites. The building also incorporated a resident’s gymnasium, cinema, and reception/concierge area.
Our Role
EDP Environmental worked with the mechanical and electrical contractor developing the working drawings, in particular the central plant room setting out and 3D modelling.
The MEP services incorporated central heating and cooling plant, with heat interface units to each apartment for hot water generation and heating distribution via underfloor heating. A central cooling plant provided mechanical cooling to each apartment. Local ventilation systems provided “whole house” heat recovery ventilation to each apartment.
The Team
- Client
Grainger - Architect
Assael Architecture Limited - Main Contractor
Elmer Construction - Services Contractor
Greenside Integrated Services - Project Value
£ 40M
Systems Included
- Central Heating Boilers and CHP Units
- Ventilation
- Chilled Water Cooling System
- Lighting, Fire and security Systems
EAGLE YARD
Construction of 3 blocks with 28 high end student apartments. Each apartment included their own kitchen, living space, bedroom and en-suite.
Our Role
EDP Environmental worked along side the Architect and carried out the full Mechanical and Electrical design on the building, and Part L compliance.
The Team
- Client
Tybourne Limited - Architect
Highway Field Associates - Main Contractor
Tybourne Limited - Services Contractor
Priddy Engineering Limited - Project Value
£ 2.3M
Systems Included
- Utility Supplies
- Lighting
- Fire Alarm System
- Access Control System
- Heating
- Domestic Services
- Ventilation
- Controls