project

ST DAVID’S BUILDING

Renovating and remodelling the existing St David’s Building at West of England School to improve the residential accommodation. The school relied on fundraising to enable this project to go ahead so tight budget control was required at all stages of design and construction.

Our Role

EDP Environmental carried out the fully detailed MEP Design to improve the heating, domestic and ventilation systems to the requirements of the National Care Standards. Systems were carefully designed to ensure maximum usability to the learners with visual impairments while ensuring suitability for a site wide expansion project in the future.

The Team
  • Client
    West of England School
  • Architect
    Lee Wright Associates
  • Main Contractor
    Midas
  • Services Contractor
    Totus
  • Project Value
    £ 1.2M
Systems Included
  • Heating and Hot & Cold Water Services
  • Ventilation
  • Electrical Distribution
  • Small Power
  • Lighting - Uniform with Glare Control and Minimal Contrast
  • Nurse Call System
  • Access Control and Communications

project

CHURSTON GRAMMAR SCHOOL

New 6th Form Building at the existing Churston Grammar School incorporating passive stack-effect natural ventilation. The development provided state-of-the-art IT Suites, Study Zones and Communal areas.

Our Role

EDP Environmental carried out the detailed MEP Design, Tender Management and Project Delivery of all mechanical and electrical building services.

The Team
  • Client
    Churston Ferrers Grammar School
  • Architect
    Kirkham Board Associates
  • Main Contractor
    Enelco
  • Services Contractor
    Dodd Group
  • Project Value
    £ 2M
Systems Included
  • Stack-effect Natural Ventilation with Air Access Routes
  • Air Source Heat Pumps
  • Underfloor Heating System
  • Hot and Cold Water Services
  • LED Lighting with Daylight Dimming
  • Small Power
  • Access Control & Communications Systems
  • IT Server Room
  • Fire Alarm System
  • Building Energy Management System (BEM)

project

GREATFIELDS SCHOOL

This was a multi-phase project of purpose-built new classrooms and support facilities for 1,800 pupils in the 11-18 age group, located in Barking, Essex. The construction comprised of the latest timber technology to provide a ‘fast track’ approach to a new education facility.

Our Role

EDP Environmental were commissioned to carry-out the detailed MEP Design. We also developed the Energy Strategy in accordance with the London Plan and determined the most cost-effective way to meet the 30% Carbon offset requirement. Our expertise in Thermal Modelling using TAS software was valuable in  ensuring compliance with BB101 and meeting the BREEAM level of “Very Good”.

The Team
  • Client
    London Borough of Barking and Dagenham
  • Architect
    Surface To Air
  • Main Contractor
    MID Group
  • Services Contractor
    Greenside Integrated Services
  • Project Value
    £ 35M
Systems Included
  • Photo-voltaic Panels (PV) – 57kW
  • Air Source Heat Pumps (ASHP)
  • Electrical Distribution
  • Lighting & Small Power
  • Ventilation
  • Heating
  • Domestic Hot & Cold Water
  • Fire Alarm System
  • Security & Access Control Systems
  • Audio Visual System – TV, Telephone, Broadband

project

CHULMLEIGH COMMUNITY COLLEGE

A multi phase demolition of a 1950’s style Devon secondary school and replacement by the building of a modern state of the art Academy across multiple new buildings.

Our Role

EDP Environmental completed the full MEP Design and Energy Strategy for all 3 phases.

The Team
  • Client
    Chulmleigh Academy Trust
  • Architect
    Oxenham Consult
  • Main Contractor
    Devon Contractors
  • Services Contractor
    MITIE
  • Project Value
    £ 6M
Systems Included
  • Ground Source Heat Pumps
  • Air Source Heat Pumps
  • LED Lighting
  • Smart Metering
  • Passive Ventilation
  • Solar PV
  • MVHR Ventilation
  • LV Power Distribution
  • Fire Alarm Systems

project

HAVERHILL SPORTS CENTRE

Extensive refurbishment and redevelopment of the existing Haverhill Leisure Centre to create a modern 3-storey building. The centre now accommodates a refreshed entrance and reception areas with a café. There is a “Self Centre” which includes a children’s soft play area and a new climbing wall on the ground floor, a multi-use studio and Fitness Suite on the first-floor level and office accommodation on the second floor.

Our Role

EDP Environmental were commissioned to carry-out the detailed Mechanical and Electrical Design making use of existing building services, extending where possible and renewing where necessary.

The Team
  • Client
    Alliance Leisure
  • Architect
    Sanders Boston Architects
  • Main Contractor
    Etec Group
  • Services Contractor
    Etec Group
  • Project Value
    £ 1.8M
Systems Included
  • Electrical Distribution
  • Lighting & Small Power
  • Ventilation
  • Heating
  • Domestic Hot & Cold Water
  • Fire Alarm System
  • Security & Access Control Systems
  • Audio Visual System – TV, Telephone, Broadband

project

TOPSHAM COMMUNITY CENTRE

The existing library and community hall was  demolished and a new community centre built on the site.  The scheme includes a multi-purpose hall to accommodate dining and functions, kitchen, day centre, library, meeting rooms, fitness studio, treatment rooms and community offices.

Our Role

EDP Environmental initially provided an outline Mechanical and Electrical scheme design to satisfy the planning and funding conditions.  We then completed the detailed design of all Mechanical and Electrical services.

The Team
  • Client
    Estuary League of Friends
  • Architect
    Kirkham Board
  • Main Contractor
    Enelco Limited
  • Services Contractor
    Ourheat Limited
  • Project Value
    £ 1.5M
Systems Included
  • LED Low Energy Lighting
  • Underfloor Heating (UFH)
  • Natural Ventilation & Heat Recovery Units (NVHR)
  • CO2 Controls
  • Photo-voltaic Panels (PV)
  • BEMS – Building Energy Management System

project

THE DONKEY SANCTUARY

A major upgrade and new buildings were required at the Donkey Sanctuary Charity in Sidmouth. This included a new veterinary medical facility with operation theatres, recovery bays and stables for the donkeys. At the entrance a new reception area, restaurant and visitors centre for the numerous visitors that enjoy the facility was also needed.

Our Role

EDP Environmental carried-out the detailed Mechanical and Electrical Design. The veterinary operating theatres were constructed to medical standards with medical gases and high efficiency particle arrestors (HEPA) plus heat recovery in the ventilation system.

The Team
  • Client
    The Donkey Sanctuary
  • Architect
    Lacey Hickie Caley
  • Main Contractor
    South West Build
  • Services Contractor
    EX2 Electrical
  • Project Value
    £ 3M
Systems Included
  • Electrical Distribution
  • Lighting & Small Power
  • Standby Diesel Generator Set
  • Theatre Ventilation
  • Heating
  • Domestic Hot & Cold Water
  • Fire Alarm System
  • Security & Access Control Systems
  • Audio Visual System – TV, Telephone, Broadband

project

LYMPSTONE MANOR

The complete renovation and extension of Lympstone Manor near Exeter, a Grade II Listed Building.

The conversion of this prestigious country manor house overlooking the River Exe Estuary has seen the property develop into a 21 bedroom boutique 5 Star Hotel & Restaurant with a coveted 2 Michelin Stars. The development includes beautiful gardens, vineyard and extensive wine cellar.

This stunning building is now owned by the celebrity chef Michael Caines MBE.

Our Role

EDP Environmental were commissioned to carry out the detailed Mechanical & Electrical Design and assist Michael and his project team in transforming this historic building.

The Team
  • Client
    Michael Caines MBE
  • Architect
    Rud Sawers Architects
  • Main Contractor
    Moor Manage
  • Services Contractor
    Dodd Group
  • Project Value
    £ 3M
Systems Included
  • Electrical Distribution
  • Lighting & Small Power
  • Ventilation
  • Heating
  • Domestic Hot & Cold Water
  • Fire Alarm Systems

project

BARNET HOSPITAL

To prepare a feasibility report, for the proposed replacement of the Washer Disinfectors within the existing Sterile Services Department, at Barnet Hospital.

Our Role

Working with the Hospital Engineering Department, and the Sterile Services Department Manager, EDP Environmental undertook a system resilience review and prepared a feasibility report for the replacement of the existing Washer Disinfectors within this live hospital environment

Providing a critical service within the hospital for the washing and disinfection of the clinical instruments, these Washer Disinfectors are reliant upon a number of services including:

  • Steam and Condense Supply
  • Hot (Process) Water Supply
  • High Temperature Water Discharge To Drain
  • Reverse Osmosis (RO) Hot Water Supply

 

The feasibility report considered the existing main plant resilience and continuation of supply, and the phased plant replacement within this live critical department.

The Team
  • Client
    Royal Free London NHS Trust
  • Architect
    CFES Ltd
  • Main Contractor
    CFES Ltd
  • Services Contractor
    CFES Ltd
  • Project Value
    £ 250K (Estimated Contract Value)

project

HARLEY STREET OPERATING THEATRE

The provision of two new operating theatres and associated recovery and support spaces within the existing building at 19 Harley Street.

Our Role

EDP Environmental undertook the detailed MEP Design as well as coordination of the Mechanical and Electrical services installation. The project designs were fully compliant with Health Building Note (HBN) and Health Technical Memoranda (HTM) standards. We played a key role in the successful completion of two new theatres on time and within budget on a very constrained site.

The Team
  • Client
    Nuada Medical
  • Architect
    VI Architects
  • Main Contractor
    CFES
  • Services Contractor
    Aura Air Conditioning & Charlwood Electrical
  • Project Value
    £ 600K
Systems Included
  • Heat Recovery Ventilation
  • Heating and Hot & Cold Water
  • UPS/IPS Electrical Systems
  • Medical Gas Services
  • Surgeons Control Panels
  • Data & Communication
  • Small Power
  • Lighting